clause 804 granular material

clause 804 granular material

Clause 804 Granular Materials NRA SHW - Roadstone ...

Clause 804 Granular Materials NRA SHW Approximate Quantity. Get a Quote. Category: Stonefill.

Read More
Volume 2 Notes for Guidance on the Specification for

2021-7-7 · NG 803, 804 and 805 Granular 2 Material Types A, B and C Clause 804 excludes all gravels from Granular Material "IYpe B. In practice clean boulders and cobbles retained on a 100 mm BS sieve can be crushed to produce a satisfactory Granular Material Type B. The soundness test should initially be used for source approval of aggregates and thereafter

Read More
Stone & Aggregates Supplier - Limestone, Sandstone ...

Clause 801 Unbound Materials for Sub-bases and Road Bases: Clause 803 Granular Material Type A: Clause 804 Granular Material Type B: Clause 805 Granular Material Type C: Clause 806 Wet-Mix Macadam Type D: Down Stone – 3/4inch/2 inch/3 inch/4 inch: Washed Stone – 2 inch/3 inch/4-6 inch: Class 6 material to T2 Specification

Read More
Specification for Road Works Series 800 - Road

2021-7-7 · 804 Granular Material Type B 805 Granular Material Type C (Open Graded Unbound Mixtures) 806 Granular Material Type D (Wet Mix Macadam)

Read More
DOWNLOADS - SOIL PROPERTY TESTING

2021-6-14 · Type 2 - Specification for Highway Works - Clause 804 -Granular Sub-Base material. Site Services data and information sheets. TRL Dynamic Cone Penetrometer (DCP) information. TRL Dynamic Cone Penetrometer (DCP) example report.

Read More
Hanlon Concrete | Sand & Aggregates

Clause 804 is used as a blinding or finished surface on top of a base material (e.g. Clause 616). Clause 616 This is a gravel type material which is extracted directly off the face/top of the gravel pit. Clause 616 consists of big stones down to a fine gravel. Its primary use is as a

Read More
SERIES 800 ROAD PAVEMENTS UNBOUND, CEMENT

2018-2-27 · Other materials (Class X), including wood, plastic and metal 1 6 (02/16) When required by contract specific Appendix 7/1 and Clauses 803 and 804 as appropriate, the unbound mixture shall satisfy the minimum CBR requirement of contract specific Appendix 7/1 when tested in accordance with clause 7 of BS 1377-4, with surcharge discs.

Read More
FH - corkcoco.ie

2020-5-28 · filled with clause 804 / 808 material in accordance with the national roads authority specification for road works. the granular material shall be laid above this void backfill material. 8. should minimum cover not be achievable, concrete grade c8/10 shall be used as backfill material. 9. marker tape to be 400mm wide blue polyethylene material in

Read More
Aggregates - Dowling Quarries LtdDowling Quarries Ltd

Clause 804 (1 ½ ˝ Down) Clause 803 2˝ Clean Crushed Stone (clause 503 / 20mm Clean Drainage Stone) ... Aggregates for unbound and hydraulically bound materials for use in civil engineering work and road construction. S.R. 21:2014. Guidance on the use of EN 13242:2002 - Aggregates for unbound and hydraulically bound materials for use in civil ...

Read More
8 Specification of earthworks fill materials | bs6031-2009

2021-11-6 · 8 Specification of earthworks fill materials 8.1 General A specification should adequately describe the design requirements, be easily understood by the parties to the contract, be practicable and capable of both enforcement and measurement, and not be unnecessarily costly or time consuming in its application. It should be capable of being monitored by an effective form of

Read More
Pyrites in Unbound Granular Fill Material supporting ...

2016-2-18 · 3. For many years up to that point, specification of fill material under ground bearing slabs by reference to Clause 804 of the NRA Specification for Road Works had been common practice among consulting engineers in Ireland. Clause 804 material was seen as a high quality product and was considered by consulting engineers generally to be a higher

Read More
Crushed Stone - Clause 804 - Irish Standards (NSAI ...

Description. Crushed Sandstone. Meets Clause 804 – Irish Standards (NSAI) For Use in Hard Standing & Pavement Construction. Coverage: 10m 2 at Depth of 2 Inches per Tonne. Additional information. Weight. 1 Ton Bulk Bag, 18 Ton Loose Load, 30 Ton Loose Load. Size.

Read More
Clause 804 – Flaherty Hardware

Clause 804. Clause 804. Add to Wishlist. Compare. Categories: Gravel, Quarry Products. Description. Description. Clause 804 (less dust than screenings) has a whole range of versatile uses. It is sold lose by the tonne.

Read More
ROAD PAVEMENTS - UNBOUND, CEMENT AND OTHER

Clauses 803 and 804 as appropriate, the unbound mixture shall satisfy the minimum CBR requirement of Appendix 7/1 when tested in accordance with clause 7 of BS 1377-4, with surcharge discs. The specimens shall be tested in a soaked condition. The mixture shall be tested at the density and moisture

Read More
Aggregates - Dowling Quarries LtdDowling Quarries Ltd

Clause 804 (1 ½ ˝ Down) Clause 803 2˝ Clean Crushed Stone (clause 503 / 20mm Clean Drainage Stone) ... Aggregates for unbound and hydraulically bound materials for use in civil engineering work and road construction. S.R. 21:2014. Guidance on the use of EN 13242:2002 - Aggregates for unbound and hydraulically bound materials for use in civil ...

Read More
Type 1 Sub Base Clause 803 | Tarmac

A graded angular material, either crushed rock, crushed slag or recycled aggregates, that meets the requirements of Clause 803 - Specification for Highway Works. Type 1 Sub Base is generally a 40mm graded to dust material that is laid and compacted to form a level stable construction layer as a platform for asphalt or concrete.

Read More
S.R. 21 - ANNEX E: 2016 - Roadstone

2020-11-19 · Suitability graded structural unbound granular ill material (0/125mm), for use at depths greater than 900mm below the radon barrier/damp proof membrane T.1 Structural Structural unbound granular ill material is an all in graded aggregate (0-32mm) or gravel (0/40mm) to facilitate placing and compactability. (Current material) T.2 Permeable

Read More
TABLE 6/1: (11/05) Acceptable Earthworks Materials ...

2021-3-9 · Material Properties Required for Acceptability (In Addition to Requirements on Use of Fill Materials in Clause 601 and Testing in Clause 631) Class General Material Description Typical Use Permitted Constituents (All Subject to Requirements of Clause 601 and Appendix 6/1) Acceptable Limits Within: Defined and Tested in Accordance with: Property ...

Read More
8 Specification of earthworks fill materials | bs6031-2009

2021-11-6 · 8 Specification of earthworks fill materials 8.1 General A specification should adequately describe the design requirements, be easily understood by the parties to the contract, be practicable and capable of both enforcement and measurement, and not be unnecessarily costly or time consuming in its application. It should be capable of being monitored by an effective form of

Read More
SECTION-7: BILL OF QUANTITIES - gshp2.gov

2021-10-7 · unserviceable materials and stacking of serviceable material to be used or auctioned complete as per technical specification clause 201 or as directed by the Engineer. ha . 41 . 2.02 . Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete,

Read More
Pyrites in Unbound Granular Fill Material supporting ...

2016-2-18 · 3. For many years up to that point, specification of fill material under ground bearing slabs by reference to Clause 804 of the NRA Specification for Road Works had been common practice among consulting engineers in Ireland. Clause 804 material was seen as a high quality product and was considered by consulting engineers generally to be a higher

Read More
Crushed Stone - Clause 804 - Irish Standards (NSAI ...

Description. Crushed Sandstone. Meets Clause 804 – Irish Standards (NSAI) For Use in Hard Standing & Pavement Construction. Coverage: 10m 2 at Depth of 2 Inches per Tonne. Additional information. Weight. 1 Ton Bulk Bag, 18 Ton Loose Load, 30 Ton Loose Load. Size.

Read More
Clause 804 – Flaherty Hardware

Clause 804. Clause 804. Add to Wishlist. Compare. Categories: Gravel, Quarry Products. Description. Description. Clause 804 (less dust than screenings) has a whole range of versatile uses. It is sold lose by the tonne.

Read More
Aggregates - Dowling Quarries LtdDowling Quarries Ltd

Clause 804 (1 ½ ˝ Down) Clause 803 2˝ Clean Crushed Stone (clause 503 / 20mm Clean Drainage Stone) ... Aggregates for unbound and hydraulically bound materials for use in civil engineering work and road construction. S.R. 21:2014. Guidance on the use of EN 13242:2002 - Aggregates for unbound and hydraulically bound materials for use in civil ...

Read More
P9464-119(F) Specification for Highway Surfacing

2016-10-14 · 450mm minimum thick granular material Type 1 to SHW Clause 803. Granular material laid in accordance with SHW Clause 802. GEOTEXTILE: Geotextile "LOTRAK25R”, or similar, over formationto be laid in accordance with the manufacturers recommendations. SUBGRADE: Upon achieving satisfactory levels at formation the area shall be proof rolled

Read More
S.R. 21 - ANNEX E: 2016 - Roadstone

2020-11-19 · Suitability graded structural unbound granular ill material (0/125mm), for use at depths greater than 900mm below the radon barrier/damp proof membrane T.1 Structural Structural unbound granular ill material is an all in graded aggregate (0-32mm) or gravel (0/40mm) to facilitate placing and compactability. (Current material) T.2 Permeable

Read More
8 Specification of earthworks fill materials | bs6031-2009

2021-11-6 · 8 Specification of earthworks fill materials 8.1 General A specification should adequately describe the design requirements, be easily understood by the parties to the contract, be practicable and capable of both enforcement and measurement, and not be unnecessarily costly or time consuming in its application. It should be capable of being monitored by an effective form of

Read More
TABLE 6/1: (11/05) Acceptable Earthworks Materials ...

2021-3-9 · Material Properties Required for Acceptability (In Addition to Requirements on Use of Fill Materials in Clause 601 and Testing in Clause 631) Class General Material Description Typical Use Permitted Constituents (All Subject to Requirements of Clause 601 and Appendix 6/1) Acceptable Limits Within: Defined and Tested in Accordance with: Property ...

Read More
SECTION-7: BILL OF QUANTITIES - gshp2.gov

2021-10-7 · unserviceable materials and stacking of serviceable material to be used or auctioned complete as per technical specification clause 201 or as directed by the Engineer. ha . 41 . 2.02 . Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete,

Read More
Granular Sub-base (GSB)-Specification and construction ...

2020-8-18 · Granular Sub Base. Granular Sub-base (GSB) consists of laying and compacting well graded material on prepared sub-grade in accordance with the specifications.: GSB layer is intermediate layer in between Sub-grade and Wet mix macadam. GSB layer is laid in

Read More